top of page
Search

Risk analysis

Casting

The biggest advntage of an in-group casting was that there were no risks involved regarding backing out or the quality as the group members knew that their grade depends on this project.


Location

Locations wise there were not much risks other than electricity outage and load shedding which could lead to massive breaks in between shoots. Other than that the location was perfect


Equipment

Equipment wise there were two major risks involved which was the summer heat and load shedding, cameras and equipment tend to over heat in high temperatures especially with electricity outages and no fans or air conditioners


Weather

Weather wise there was no risk involved as most scenes were indoor besides a few police scenes which were in the evening however checking the forecast helped reduce this risk immensely




3 views0 comments

Recent Posts

See All

Comments


bottom of page